CHP (cogeneration)

Generator protection and grid-decoupling for combined heat and power plants

Generator protection and grid-decoupling for combined heat and power plants

For CHP plants, SYMAP® solutions cover generator unit protection and control, grid decoupling, synchronization, voltage and frequency monitoring, transformer protection, feeder and connection cell protection, communication with the supervisory system and event/fault recording.

For the grid connection of a CHP genset or smaller CHP plant with Grid Code requirements, SYMAP® Compact+ GC is considered as the protection, metering and control layer on the AC interface and PCC. For plants with multiple gensets, parallel operation, load sharing, island operation, automatic load shedding or bus-tie logic, the corresponding SYMAP® BCG/ECG variants are considered for Power Management and generator group coordination.

CHP (cogeneration)

Recommended products

SYMAP® Compact+ — compact IED for individual cells and grid connection
Classic SYMAP® series — application variants for CHP system architecture

Note: Compact+ F1/F2/F3/F4 should not be interpreted as direct equivalents of the classic SYMAP® F/M/T/G variants. The Compact+ variant is selected according to measurement inputs, CT/VT configuration, I/O, communication and Order Code options. The classic SYMAP® series is selected according to the application and system architecture.

Which SYMAP® for this application?

For the grid connection of a CHP genset or smaller CHP plant with Grid Code requirements, SYMAP® Compact+ GC is considered as the protection, metering and control layer on the AC interface and PCC. For larger CHP systems, the configuration is extended according to the number of gensets, transformers, feeder cells, auxiliary drives, DC supplies and communication requirements. For multiple gensets in parallel operation, load sharing, island operation, automatic load shedding and bus-tie logic, the SYMAP® BCG/ECG variants are considered. Compact+ F1/F2/F3/F4 are selected according to the measurement inputs and function of the individual cell, while the classic SYMAP® G/F/T/M/DC/ARC variants are considered according to the application and system architecture.

References

Installation references and market position:

  • Part of approximately 50 hydroelectric and combined heat and power plant installations

Grid code compliance for CHP grid-parallel operation

  • VDE-AR-N 4110:2018-11 — medium voltage, FGH certified
  • VDE-AR-N 4120:2018-11 — high voltage, FGH certified
  • G99 — UK grid code
  • EZA / EZE / NA controllers for grid-parallel and islanded operation

Need detailed technical specifications?

Contact our team for project-specific specifications, datasheets, configuration support, and pricing. Detailed technical data is available on request.

Request technical specs General inquiry

Stucke Elektronik Balkan d.o.o.
Ustanička 168, 11050 Belgrade, Serbia · +381 11 40 49 690
© 2026 Stucke Elektronik Balkan d.o.o. — All Rights Reserved